国产原创AV在线_中文字幕αv一区_无码精品欧日韩av观看_超碰AV在线网站_青草无码视频在线免费播放

Strengthening

Location:Home>Strengthening

National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


洪湖市| 花莲市| 泸水县| 宣化县| 大埔区| 合阳县| 无锡市| 宜君县| 车险| 德州市| 福贡县| 久治县| 普宁市| 田阳县| 闸北区| 临猗县| 军事| 锡林浩特市| 新田县| 松江区| 米林县| 绵竹市| 普安县| 广灵县| 铅山县| 临桂县| 玛曲县| 布尔津县| 宁阳县| 玉环县| 平湖市| 大连市| 克什克腾旗| 自治县| 舞阳县| 桐乡市| 水城县| 南宫市| 星子县| 临沭县| 垫江县|